- Determining the priorities and necessities of sewerage projects, studying and reviewing them according to the duration of the start of the project to the completion stage and providing corrective comments in order to advance the works.
- Preparing or approving plans for wastewater collection and disposal networks, including surveying the area, distribution of population per capita of wastewater production,
- Water and sewage network design in different situations
- Presentation of network implementation plans, selection of pipes and preparation of plans and implementation details
- Supervising the preparation of tender documents according to the final plan and the results of studies conducted based on standards and regulations
- Preparation and approval of tender documents and private terms of contracts related to projects and cooperation in holding tenders
- Monitoring the works provided by contractors, consulting engineers, etc. based on the concluded contracts, review and analysis
According to their reports
- Coordinating with the executive units in order to improve the plans during the implementation and constructive suggestions for the desired level of operation.
- Supervising the technical calculations of sewage plans, determining the list of quantities and materials needed to implement the work in the network plans, the technical specifications of the related maps and diagrams, and estimating the cost using the standard price list or the list of other authorities.
- Supervising the drafting of contracts in order to use the services of consulting engineers
- Preparation and adjustment of the operation schedule of study plans, mapping, implementation and exploitation of sewage
- Participating in technical and engineering meetings to select sewage plans and present the strengths and weaknesses of existing plans
- Final approval of maps, profiles, plans and sewage projects
- Control, review and approval of the temporary and definitive situations provided by the contractors, if they are consistent with the provisions of the approval agreement
- Mechanizing the work system of the technical office and engineering services in order to speed up the executive works and improve the existing methods
Classification of maps using modern methods and supervision of maintenance and distribution of documents, reproduction and copying of maps, etc.
- Preparation of statistical reports and necessary analyzes of activities related to the development of facilities